Jump to content
Lewis

Assembling WIR panels

Recommended Posts

:roll: Just been to B&Q with father to buy everything ready for Thursday and left with nothing!

He doesn't want the whole thing slabbed, just the edge. I've said we need it all slabbed and all the reasons, so he now wants a concrete base (because its faster to do) which is a start.

Also said we don't need a plastic roof! :roll: We are having a roof :lol: the guttering will probably come a couple of weeks after its all up.

 

"We need to sit down and plan it out" ... only what I've been saying for the last howevermany months :lol:

Link to comment
Share on other sites

Have assembled all of the panels now, just was stuck on the slope for the run and found this again so bumping it up just incase others are stuck.
The slope of the roof needs to be around 50mm over a 6' fall (sorry about the mixed units!). See the pictures below, the front support baton is 50mm high and the run is 6 feet front to back.

 

IMG_1874.JPG

 

IMG_1875.JPG

 

There's a few other pictures of the roof and guttering ** here **

 

Andrew

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...